Boeing
AM Tooling & Internal Structures
Previous FSAE aerodynamic wings were manufactured using traditional machined foam and polymer features to create a defined shape. With these types of tools the internal structure has to be removed after cure, and once removed are left with a hollow structure. A slit is placed on the rear facing edge to allow access for the internal supporting structure to be installed. The traditional method consists of multiple steps, and this capstone hopes to reduce these steps. This project was meant to assist in the students learning about additively manufactured (AM) tooling and topology optimization structures within a composite aerodynamic wing. The AM sub-structure could be used for multiple purposes; to support in tooling for composite layup, curing of the composite wing, and structure to support on the car. The process aimed to help reduce manufacturing time and create an opportunity for students to understand the interaction between composites and polymers.
Faculty Adviser
Ashley Emery,
Professor,
Mechanical Engineering
Students
Anusha Jain
Calvin Nguyen
Gabriel Hallett
Malachi Morris
Shahrul Song
Related News
Fri, 09/20/2024 | UW Civil & Environmental Engineering
Smarter irrigation for a greener UW
A new project combines satellite data with ground sensors to conserve water and create a more sustainable campus environment.
Mon, 09/09/2024 | UW Mechanical Engineering
Testing an in-home mobility system
Through innovative capstone projects, engineering students worked with community members on an adaptable mobility system.
Mon, 08/19/2024 | UW Mechanical Engineering
Students strive to ensure accurate AED shock dosage
ShockSafe, developed by students with the help of mentors from Philips and Engineering Innovation in Health (EIH), can distinguish between children and adults during cardiac arrest emergencies.
Wed, 08/07/2024 | Snohomish County News
Snohomish County, University of Washington partnership boosts efficiency in enterprise scanning center
UW Industrial and Systems Engineering Capstone Project set to save Snohomish County over $40,000 annually.