Skip to main content

Industry & alumni

Puget Sound Energy (PSE)

Transmission System Hosting Capacity Map

Puget Sound Energy (PSE) faces an increasing need to acquire generation resources to meet customer demand, as well as the renewable resource goals outlined in the Clean Energy Transformation Act. Developers seeking to interconnect generation to the system, as well as load (including charging of Battery Energy Storage Systems), face increased congestion due to factors such as electrification, EV adoption and an increased penetration of DER. This system congestion results in increased interconnection costs for the developer, who bear the costs of the system upgrades needed to accommodate these resources. This student team worked to develop a transmission system hosting capacity map to indicate to developers which areas of the system may be constrained and where there may be available capacity to accommodate new resources. This map may also be used to identify areas where PSE can target proactive projects to facilitate the integration of renewable resources. The hosting capacity needed to be determined for both generation and load in consideration of system performance requirements under NERC credible contingencies. The desired project outcome for this student team was a methodology and (potentially automated) process for calculating hosting capacity on all PSE transmission lines. This student team worked to complete calculation of hosting for both generation and load under a variety of NERC credible contingencies (including all lines in service, N-1 and N-1-1) for both summer and winter seasons for the upcoming year. As time allowed, this student team was able to work to study and represent additional scenarios on the map (such as studying an 10-year scenario to identify whether future system projects will benefit/impact hosting capacity) . This student team worked to deliver a GIS map that color codes transmission facilities based on the amount of capacity available for interconnecting new resources.

Faculty Adviser

Payman Arabshahi, Associate Professor, UW ECE, Electrical & Computer Engineering

Students


Related News

Close-up of utility poles with mounted electronic devices and cables in an outdoor setting

Fri, 09/20/2024 | UW Civil & Environmental Engineering

Smarter irrigation for a greener UW

A new project combines satellite data with ground sensors to conserve water and create a more sustainable campus environment.

One person is sitting in a hammock chair, while another person holds part of the frame structure

Mon, 09/09/2024 | UW Mechanical Engineering

Testing an in-home mobility system

Through innovative capstone projects, engineering students worked with community members on an adaptable mobility system.

Five ShockSafe team members stand next to their poster and their prototype of their device

Mon, 08/19/2024 | UW Mechanical Engineering

Students strive to ensure accurate AED shock dosage

ShockSafe, developed by students with the help of mentors from Philips and Engineering Innovation in Health (EIH), can distinguish between children and adults during cardiac arrest emergencies.

ISE Senior Capstone class

Wed, 08/07/2024 | Snohomish County News

Snohomish County, University of Washington partnership boosts efficiency in enterprise scanning center

UW Industrial and Systems Engineering Capstone Project set to save Snohomish County over $40,000 annually.